|
CLIENT | LOCATION | JOB DESCRIPTION | AMOUNT | UNIT |
KOCH KNIGHT | Erzincan, TURKEY | Anagold CSEP Acid-proof Surface Protection Installation Works | 870 | ton |
CENGİZ HOLDİNG | Samsun, TURKEY | Eti Bakır X-Line Refractory Installation Work | 600 | ton |
GEMONT | İzmir, TURKEY | STAR ARP Reformer Unit Refractory Installation Works | 900 | ton |
DEMA | Izmir, TURKEY | TÜPRAŞ U-7000 CDU Revamp Refractory Lining Works | 470 | ton |
GAMA POWER | Erbil, REPUBLIC OF IRAQ | Khabat Thermal Power Plant Refractory Lining Works | 2 | pcs |
|